Enter a few measurements, pick your decking and railing, and see your deck and a price range in about two minutes.
Seattle Times Best in the PNW winner in 2023, 2024 and 2026. TimberTech Platinum Pro Elite. Veteran owned. Building decks since 2015.
Measure the width along the wall of the house, and the height from the ground to the top of the deck.
Levels at different heights are joined with steps automatically. Stacked levels (for example a ground level deck under a second story deck) sit directly above or below the main deck and can be joined with a staircase.
Opens up the space under the deck. An engineered beam can span up to 30 ft between posts. Final beam and joist sizes are confirmed by our engineer.
Building code requires a guard rail on any deck more than 30 inches off the ground.
Lights go on stair risers and railing posts. Tap Night in the 3D view to see them on.
Enter your ZIP code so we can include local sales tax.
For the picture only. Pick what looks most like your home.
Drag furniture, a kitchen or a hot tub onto your deck, at real sizes. These are for planning and are not in the price. A hot tub doubles the framing under the tub, and that is included in your estimate.
Tell us where to send it. Your estimate shows right away.
Next step: book your free on-site consultation. We confirm the measurements and lock in your price.
Book my free consultationWant to spread out the cost? We offer financing through Hearth, with monthly payment options. See financing options
This is an instant estimate, not a quote. Your final price is set after a free on-site consultation, where we confirm measurements, site conditions and design details.
It is a planning range built from our current pricing. Your final price is set after a free on-site consultation, where we confirm measurements, site conditions and design details.
Most decks more than 30 inches off the ground need one. The estimator shows your price with and without a permit, and we recommend one whenever it is required. We handle the engineering and the permit for you.
Engineering and permits typically take 8 to 12 weeks. Construction typically takes 4 to 6 weeks.
Yes. We offer financing through Hearth with monthly payment options. See financing options.
Greater Seattle and the Eastside, Spokane, Coeur d’Alene, Hayden, Post Falls, Sandpoint and the surrounding areas across Washington and North Idaho.
No. The estimator and the on-site consultation are both free, with no obligation.
Book a free on-site consultation, or call us at (425) 999-2048.
Book my free consultation© 2026 3 Brothers Decking LLC. All rights reserved. The 3 Brothers Decking Deck Estimator, including its design, 3D visuals, pricing method and code, is proprietary and protected by copyright. Copying, scraping or reuse without written permission is prohibited. Use of this tool is subject to our Terms of Use.

Copyright © 2026. 3 Brothers Decking. All rights reserved.